B1018 Cold Norton Road, Purleigh, Essex

19 February — 19 February

Delays likely – Traffic control (two-way signals)

Works location: ABOUT 75M UP FROM ELMFIELD COLD NORTON ROAD LATCHINGDON ESSEX CM3 6HP

Works description: Access required to Underground BT structure to PROVIDE service – No structural changes. Work being carried out on existing BT Plant

Responsibility for works: Openreach

Current status: Advanced planning

Works reference: BC005CC1W019FEBXTB121EA1


B1021 Station Road, Burnham-on-crouch, Essex

24 February — 26 February

Delays likely – Traffic control (give & take)

Works location: 171 – 173 Old King and Hines Hardware Shop

Works description: Air bricks and damp course covered up by footway surface course (HW: FWSF 2008 STRATEGY)

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP201EH2289199


B1010 Burnham Road, Althorne, Essex

22 February — 24 February

Delays possible – Some carriageway incursion

Works location: O/S PINEWOOD WOOD, BURNHAM ROAD,

Works description: LATCHINGDON 711648 – INTERIM TO PERMANENT – in FW

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005CC1W0000000IBBFD9AE


Station Road, North Fambridge, Essex

24 February — 20 March

Delays possible – Traffic control (two-way signals)

Works location: Alongside Fambridge Road in the footpath up to the HV pole on Strathmore Road. f\w. c\w. verge.

Works description: Connections Projects:Installation of a new electricity supply for a customer:Installation of a new electricity supply for a customer, open cut trench to install a new duct and HV cable to HV pole on Strathmore Road Carriageway/Footpath

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC30034834737


Clements Green Lane, South Woodham Ferrers, Chelmsford, Essex

20 February — 24 February

Delays unlikely – Traffic control (give & take)

Works location: 77

Works description: STOPTAP RENEW IN FOOTWAY AND REINSTATE

Responsibility for works: ESSEX AND SUFFOLK WATER

Current status: Planned work about to start

Works reference: EN0143422416


Dunkirk Road, Burnham-on-crouch, Essex

22 February — 23 February

Delays unlikely – Traffic control (give & take)

Works location: FOOTWAY OUTSIDE BURNHAM-ON-CROUCH PRIMARY SCHOOL ROAD CROSSING TO FEEDNO.41

Works description: LAY NEW DOMESTIC SERVICE 9M FROM MAIN IN FARSIDE FOOTWAY

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0081000904290


Foundry Lane, Burnham-on-crouch, Essex

24 February — 25 February

Delays unlikely – No carriageway incursion

Works location: Co-op

Works description: Lift up paving slabs to make small repair to private drainage run approx. 400mm deep. Works located on 5m wide footpath/entrance to Co op. Works are on behalf of the co-op supermarket

Responsibility for works: Essex

Current status: Planned work about to start

Works reference: EP02231004121


Kings Court, Burnham-on-crouch, Essex

20 February — 21 February

Delays unlikely – Some carriageway incursion

Works location: OPP 3 KINGS COURT, BURNHAM-ON-CROUCH

Works description: BURNHAM ON CROUCH 721492 – Renew / Raise / Lower Frame and Cover on FW in

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006MU1WBAUSEWAQU9D2J01


The Avenue, North Fambridge, Essex

18 February — 24 February

Delays unlikely – No carriageway incursion

Works location: At base of pole in verge out side Crossgates,. verge.

Works description: Connections Small Service:Electrical service upgrade of customer supply to ensure safe and reliable power supply:Excavating at base of pole to customers boundary. SLG all works from customers side. Parking on customers drive.

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC30034834301


The Chase, South Woodham Ferrers, Chelmsford, Essex

20 February — 24 February

Delays unlikely – Traffic control (give & take)

Works location: 10 THE CHASE SOUTH WOODHAM FERRERS CM3 5PN

Works description: WOODHAM FERRERS 728442 – Overlay – Lay approx 2m of Duct 54/56 in FW to link existing BT Boxes to facilitate spine cabling works.

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006MU1BAUSEWBGM6F0B01


The Laurels, South Woodham Ferrers, Chelmsford, Essex

19 February — 21 February

Delays unlikely – Traffic control (give & take)

Works location: S/O 77 HULLBRIDGE ROAD ON THE LAURELS, SOUTH WOODHAM FERRERS , CM3 5LH

Works description: WOODHAM FERRERS 728039 – To build new FW joint box in

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006MU1BAUSEWBGL562D01


Wembley Avenue, Mayland, Essex

19 February — 21 February

Delays unlikely – Some carriageway incursion

Works location: SIDE OF 68 THE DRIVE ON WEMBLEY AVENUE

Works description: TRANSFER OF EQUIPMENT FROM ONE POLE TO ANOTHER POLE IN VERGE

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005KL1W000000035929DNO